top of page

Notable Projects

2017.jpg

The Aquatics Centre - Olympic Park

​

TES Compliance undertook the fixed wire testing of this impressive site in Stratford, London. 

​

Much of the testing took place in the roof space gantries working above the huge 50 meter swimming pool.

Rodericks Dental - Nationwide

​

TES Compliance have recently undertaken Electrical Installation Condition Reports for Rodericks Dental across their stock.

8079588008_87a3a4735b_b.jpg
Bottom of The Shard Looking Up.jpg

The Shard - London Bridge

​

One of the most prestigious buildings on the London skyline, The Shard was a very complex building to test due to its wide variety of occupants including a 5 star hotel and a private hospital

Raw of server rack or Network device in
Raw of server rack or Network device in

Data Centre - Amsterdam

​

Working on behalf of the main contractor, TES Compliance was asked to attend the Amsterdam data centre to assist with the final check's prior to the site being occupied by technology giant, Apple. 

​

TES was asked to carry out thermal imaging inspection of a new busbar installation under full load using an array of load banks.

The Shrouds of the Somme, British and Co

The ArcelorMital Orbit Stratford

​

A unique building at the Olympic Park in Stratford, standing at 114.5m high with an events / observation platform giving stunning views of the Olympic Park.

County Hall building and Dali Universe i

County Hall - South Bank, London

​

Home of the London Dungeon and London Aquarium and a variety of food and retail outlets the testing of London's county hall was far from straightforward. With a tight deadline our teams worked around the clock to ensure the testing was completed on time. 

​

The fixed wire testing of County Hall was challenging due to the multitude of occupants and age of the installation

Whiteley Village-mplan_03-PG.jpg

The Whiteley Village - Walton-on-Thames

A retirement village located in the Surrey country side, home to 400+ residents, shops, community building and offices. TES was tasked with undertaking both the fixed wire testing and portable appliance testing of the site. Since undertaking the testing we have put in place a 5 year testing plan which involves an annual visit testing 20% of the site each year to ensure our client remains fully compliant with their obligations under the Electricity at Work Regulations 1989

MINI-Plant-Oxford.jpg

The BMW Plant - Oxford and Swindon

​

The home of the new mini, TES Compliance assisted with the fixed wire testing of part of both the Oxford and Swindon production plants including the main UK data centre.

Kodak - Glasgow

​

We have carried out a full inspection of switchgear at the Kodak building in Glasgow, the installation is 50 years old, we also carried out remedial works on the switchgear to ensure it is safe and functioning correctly.

Unknown.png
RO-2006-Makita_Factory-F10000x420.jpg

Makita Manufacturing - Telford

​

TES have been awarded a 3 year contract to undertake the fixed wire testing and thermal imaging inspection of the Makita Production Facility in Telford

​

Notcutts Garden Centres - Nationwide

​

We have recently been awarded the national contract to undertake portable appliance testing, fire extinguisher inspections and emergency lighting inspections across the Notcutts stock nationwide

Notcutts-740x431.jpg
bottom of page